Acelera DNA
Program
HomeVenturesPricingAdvancedAgentsIntegrations
Humans approve the five hard gates.
The program itself is free.
Acelera DNA
SpaceCombinator

Stage 07

Traction

DoneVentura

Design the first go-to-market motion, write experiments, and file metric stubs plus whatever first results exist.

3/3 steps completeRequired artifacts: gtm_plan, experiments, metrics

Steps

Ordered checklist persisted on this venture. Running a step asks Cloudflare Workers AI for a structured draft. Companion products stay hooks.

  1. 1

    Write GTM plan

    DoneRequired

    GTM names the first channel, the first offer, and who owns follow-up. Not a 40-page plan.

    Done when: gtm_plan has channel, offer, and a weekly review owner.

    GTMHook: Venturagtm_plan
    GTM plan
    Channel: 20 field-ops leads in one metro.
    Offer: two-week stamp pilot.
    Owner: founder, Fridays.
  2. 2

    Design experiments (ads / outreach / content)

    DoneRequired

    GTM writes two or three cheap tests with a hypothesis, a spend or time cap, and a kill line.

    Done when: experiments contains at least two tests with a kill line each.

    GTMHook: Venturaexperiments
    Experiment designs
    1. Outreach: 30 personal notes. Kill if <3 replies.
    2. Content: one teardown of a bad brief. Kill if <1 inbound.
  3. 3

    Metric stubs + first results

    DoneRequired

    Analyst opens the scoreboard: the three numbers that matter this month, plus any first results (including zeros).

    Done when: metrics names three numbers and records first_results, even if empty.

    Analystmetrics
    Metric stubs + first results
    Numbers: stamped briefs, crews using a link, replies to outreach.
    First results: 0 / 0 / 0 (board opened).

Human gate

Human approves the first experiment set and the metrics that will count.

Gate already approved.

Stage audit

  1. AKgate approvalSep 10, 12:38 PM

    Approved Approve traction experiments. Next: Raise pack.

  2. Analyststep runSep 10, 12:38 PM$0.10

    Ran “Metric stubs + first results” and filed metrics.

  3. GTMstep runSep 10, 12:38 PM$0.08

    Ran “Design experiments (ads / outreach / content)” and filed experiments.

  4. GTMstep runSep 10, 12:38 PM$0.14

    Ran “Write GTM plan” and filed gtm_plan.

← Ship MVPRaise pack →