Acelera DNA
Program
HomeVenturesPricingAdvancedAgentsIntegrations
Humans approve the five hard gates.
The program itself is free.
Acelera DNA
Lumenfield

Stage 07

Traction

LockedVentura

Design the first go-to-market motion, write experiments, and file metric stubs plus whatever first results exist.

0/3 steps completeRequired artifacts: gtm_plan, experiments, metrics
This stage is locked. Approve the previous gate to open it.

Steps

Ordered checklist persisted on this venture. Running a step asks Cloudflare Workers AI for a structured draft. Companion products stay hooks.

  1. 1

    Write GTM plan

    PendingRequired

    GTM names the first channel, the first offer, and who owns follow-up. Not a 40-page plan.

    Done when: gtm_plan has channel, offer, and a weekly review owner.

    GTMHook: Venturagtm_plan
  2. 2

    Design experiments (ads / outreach / content)

    PendingRequired

    GTM writes two or three cheap tests with a hypothesis, a spend or time cap, and a kill line.

    Done when: experiments contains at least two tests with a kill line each.

    GTMHook: Venturaexperiments
  3. 3

    Metric stubs + first results

    PendingRequired

    Analyst opens the scoreboard: the three numbers that matter this month, plus any first results (including zeros).

    Done when: metrics names three numbers and records first_results, even if empty.

    Analystmetrics

Human gate

Human approves the first experiment set and the metrics that will count.

Stage is locked.

Stage audit

No agent or gate events on this stage yet.

← Ship MVPRaise pack →